Project controls intelligence

Bring your own baseline

Stratalize reads the schedule file, checks it against the owner's specification, and produces the deliverables the contract requires. A person approves each one. Every approval is signed.

STRATALIZE
Home
Ask Stratalize
Projects
Settings
m.delgado@northbridgecivil.com
Projects
← All projects
Fox Valley Interceptor Sewer, Phase 2Make a change
24-0871-FVAP-R1 · Uploaded schedule · Data date 01-Sep-26 · 420 activities · P6 22.12 · Verify accepted version →
OverviewAsk StratalizeSchedule SubmittalsPackageDocumentsPay Applications
DueData date 01-Sep-26
Monthly update for September 202610-Sep-26 · Owner spec 01 32 10 3.5.A.2Progress file and progress plus changes file are due together. Data date for this cycle: 01-Sep-26.
Due in 4 daysDraft now
Weekly look-ahead12-Sep-26 · Owner spec 01 32 10 3.7.B.3Six-week site grid, issued Fridays, reflects the most recently submitted update.
DraftedReview
Waiting for your approval
Change set from August change log, 10 changesFinish +4 d · float on longest path -6 d · 9 approved, 1 rejected
Apply 9 changes
Pre-submission checkView full check
3 of 23 checks need attention
Fail DCMA 14 · leads 2 relationships with negative lagProposed fix: replace FS-3d on A1135 and A1190 with SS+5d; float unchanged.
Review Owner spec 3.3.B.12 Milestone MS-040 description differs from Attachment C
Package readinessResume in Package
Cover letterReady
NarrativeDrafted
Critical pathReady
Full scheduleReady
Predecessor and successor reportReady
Schedule logNeeds review
Look-aheadDrafted
Schedule exportAfter apply
Response to Comments (RTC)Not required
Critical path briefOpen
Week 37, sent to leadership Mon 08:00. Six days behind at Sta 112+00; recovery needs a second excavation crew from week 39.
NORTHBRIDGE CIVIL CONSTRUCTORS · SYNTHETIC PROJECT

The deliverables, produced from the schedule and issued under your name.

NORTHBRIDGE CIVIL CONSTRUCTORSCONTRACT 24-0871-FV
Monthly Schedule Update
Update No. 6 · Data date 01 September 2026
Contents
1.0 Narrative2.0 Milestone variance3.0 Longest path4.0 Progress by WBS5.0 Changes this period, 106.0 Six-week look-aheadAttachment A, AP-R1.xer
1.0 Narrative
Reviewed M. Delgado · Approved J. WhitfieldPage 1 of 14
Monthly Schedule Update, in the owner's format
NORTHBRIDGE CIVIL CONSTRUCTORST-2026-114
Six-Week Look-Ahead
Weeks 38 to 43 · Plazas 41 to 43
383940414243Deck demo, Plaza 41 NBDeck pour, Plaza 42 SBBarrier wall, Plaza 42Utility relocation, Plaza 43Traffic switch, Stage 3Submittal, deck rebar
critical work owner admin
Responsible party column on page 2Issued Fri 12 Sep 2026
Look-ahead, in your template
NORTHBRIDGE CIVIL CONSTRUCTORSWEEK 37 · 14 SEP 2026
Critical Path Brief
Four active projects. One behind, one to watch.
1.0 Bottom line
Fox Valley Interceptor is six working days behind its contract milestone after the Sta 112+00 dewatering slip; recovery requires a second excavation crew from week 39. All other projects hold.
2.0 What is driving the critical path
A1120Dewatering, Sta 112+00-6 dA113548-in pipe, 112 to 118+50-6 dA1190Manhole 14 structure-6 d
3.0 What changed since last week
Sources cited: AP-R1 schedule, data date 01 Sep 2026Signed record 9f2c…41ad
Critical path brief, to leadership every week
NORTHBRIDGE CIVIL CONSTRUCTORSWEEK 37 · 14 SEP 2026
Portfolio Critical Path Brief · Week 37
JobCompletionChange this weekCritical path now
Riverside Pump Station 25-1042-RC15 Mar 2027Pump submittal approvedInfluent pump delivery
Fox Valley Interceptor 24-0871-FV22 Nov 20266 days behind, dewateringInterceptor jack and bore
North Shore Tollway T-2026-11408 Jun 2027Bridge 3 pour scheduledBridge 3 deck pour
Lake County Lift Station 7 LC-26-005930 Jan 2027Wet well concrete pouredLift station wet well
Changes that moved a completion date
Fox Valley Interceptor · dewatering slip, completion +6 days · recovery crew approved
North Shore Tollway · Bridge 3 deck pour rescheduled · completion unchanged
Riverside Pump Station · pump submittal approved · completion unchanged
Resource conflicts
Week 39: 60-ton crane needed on Fox Valley and North Shore.
Signed record 4c1e…9b07Sources cited: 4 schedules, data date 01 Sep 2026
Portfolio Critical Path Brief, to leadership every Monday
WEEKLY GRID

The sheet you already print for Monday.

Same columns, same weekly rhythm: activity, who's on it, what's done, what's next. Built straight from the schedule, so it's ready before the foremen meeting instead of the night before.

Weekly Progress ScheduleWeek ending 14-Sep-26 to 12-Oct-26
ActivityDescriptionResponsible party
14-Sep-26(lookback)
21-Sep-26
28-Sep-26
05-Oct-26
12-Oct-26
SUB-047Mechanical rough-in, Level 2MEP subIn progressComplete---
SUB-014Barrier wall forming, Span 4Civil subComplete----
SUB-052Electrical panel setting, Bldg BElectrical sub--In progressComplete-
SUB-022Deck pour, Span 5Civil subDelayed: rainIn progressComplete--
SUB-061Interior framing, Level 3Framing sub---In progressComplete
SUB-031Utility relocation, Sta 12+00Utility sub-In progressIn progressComplete-
SUB-070Commissioning startup, AHU-1Commissioning agent----In progress
SUB-008Traffic switch, Stage 2GCComplete----
Weekly grid, generated from the schedule
THE WHOLE COMPANY

Leadership sees every job without a meeting.

Load every active schedule and Stratalize keeps one picture of the company current: the critical path on each job, the changes that actually moved a completion date, and the weeks where two jobs need the same crew or crane. The people who run the company get it as one brief. The schedulers get it without building it.

STRATALIZE
Home
Ask Stratalize
Projects
Settings
m.delgado@northbridgecivil.com
Projects
Northbridge Civil Constructors4 active projects · Week 37
ProjectData dateCompletionFloatCritical path nowBrief
Riverside Pump Station01-Sep-2615 Mar 2027+4 dInfluent pump deliveryOpen
Fox Valley Interceptor01-Sep-2622 Nov 2026-6 dInterceptor jack and boreOpen
North Shore Tollway01-Sep-2608 Jun 2027+11 dBridge 3 deck pourOpen
Lake County Lift Station 701-Sep-2630 Jan 2027+2 dLift station wet wellOpen
Resource conflictsWeek 39 · 60-ton crane · Fox Valley and North Shore
Portfolio Critical Path BriefWeek 37 · Sent Mon 08:00 · Signed record 4c1e…9b07
Portfolio view, synthetic projects
Priced per active project. Unlimited users, so the executive reading the brief costs nothing extra.
PROJECT CONTROLS

A change log in. Impact computed by our own CPM engine. A person approves. The same file back, signed.

See the product
Synthetic project
Awards · water and wastewater · Illinois · last 90 days31 awards
OwnerAwarded toAmountNTPEnforcement
Fox Valley Water Reclamation AuthorityNorthbridge Civil Constructors$18.4M02 Mar 20267 decisions
Lake County Public WorksHalvorsen Underground$6.1M14 Jul 20261 decision
North Shore Tollway AuthorityKessler Bridge Co.$42.7M18 May 202614 decisions
Tri-County TransitNorthbridge Civil Constructors$9.9Mpending4 decisions
CONSTRUCTION INTELLIGENCE · LAUNCHING SOON

Who won, what the owner requires, and what that owner has enforced before.

Early access
Works with
Your scheduling toolProcoreTrimbleSharePointGoogle DriveClaudeChatGPT

Bring the specification section that gave you trouble last time.

Only the people who work in the scheduling tool. Everyone who reviews, approves or reads a brief needs nothing. Reviewers and approvers use Stratalize. Projects are priced per active project with unlimited users, so the PM, the PE, and the executive who signs off all participate without a seat cost.

Stratalize produces a corrected schedule file you import. Nothing is written to your system without a person approving it.

No. Any project where the owner requires a CPM schedule and periodic updates. Owner specifications are set per project.

Priced per active project with unlimited users. Talk to us.

Yes. Every active schedule in your account rolls up into the Portfolio Critical Path Brief and a portfolio view, so leadership sees the critical path and resource conflicts across jobs, not one project at a time.